Commissioning

  1. Check that screw connections are tight.
  2. Check air channel for dirt and clean if necessary.
  3. Check that the connection data matches the technical data → rating plate.
  4. Switch the mains fuse on.
  5. Run function test. Check and ensure the smooth running of the impeller. The air must be able to flow freely.