Installation in ducts
CAUTION: Risk of cuts from metal housing plates with sharp edges. Use personal protective equipment (cut-resistant gloves) for installation work.
NOTICE: Risks of leakages if unit is not sealed tightly enough. Screw the fan firmly to the duct system at all flange holes. Fit suitable insulation, sound-absorbing and installation materials.
- For wall/ceiling attachment, fit FUI mounting feet.
- If necessary, install a GFI counter flange or GSI counter socket on the two ducts.
- Transport the fan to the installation site → chapter .
Recommendation: Attach suitable chains/ropes/lifting gear all around the housing and carefully transport the fan to the installation site using a crane, for example. NOTICE: The fan must not be deformed/warped during transport as this can lead to imbalance of the impeller. Observe the details in Transport, storage and the safety instructions supplement. - Screw the DAR fan tightly to the duct system using the ELI flexible couplings. Screw all flange holes. Observe the tightening torques. Ensure seal integrity.
- With a free inlet, also fit an SGCI or SGRI protective grille as protection against accidental contact and drawing in.
- Fit suitable insulation and sound-deadening material.