Installation instructions
Damage to the unit if the line feedthrough to the terminal box is pre-installed.
Line feedthroughs may be damaged if the connection line is pulled or the unit is lifted by the line.
- Do not pull connection lines or lift the unit using the lines.
- For permanent installation in channels with channel sizes matching the unit type (nominal size).
- For surface mounting on roof with sufficient load-bearing capacity.
- Any installation position, do not install in damp rooms with air being transported upwards.
- For ventilation or air extraction, depending on the installation position.
- Unit connection sockets on both sides for direct installation in channels.
- For reducers for connecting to other duct diameters → www.maico-ventilatoren.com.
- Further accessories → www.maico-ventilatoren.com.
No other accessories may be mounted on the motor.
Risk of explosion if ignition transmission prevention passages are not greased.
- Before fixing the cover in the housing, make sure that the connecting surfaces are clean and greased, e.g. grease AGIP GR NS 4 or comparable.