Checks before commissioning
- Perform the following checks: D = detailed check, N = close inspection, S = visual inspection
Test schedule | D | N | S | |
---|---|---|---|---|
I | No damage or unauthorised changes on unit. | ● | ● | ● |
II | Condition of terminal box seal satisfactory. Ensure connections are sealed. | ● |
|
|
III | No evidence of water or dust entering the housing in compliance with the IP rating. | ● |
|
|
IV | Encapsulated components undamaged. | ● |
|
|
V | Impeller at sufficient distance from housing (air gap). | ● |
|
|
VI | Air flow not hampered. No foreign bodies in the air section. | ● | ● | ● |
VII | Sealing of shafts, cables, ducts and/or “lines” satisfactory. | ● | ● | ● |
VIII | Duct system and transition to mixed system undamaged. | ● |
|
|
IX | Unit has sufficient protection from corrosion, weather, vibration and other interfering factors. | ● | ● | ● |
X | Accumulations of dust or dirt not excessive. | ● | ● | ● |