Commissioning
- Check that screw connections are tight.
- Check air channel for dirt and clean if necessary.
- Check that the connection data matches the technical data → rating plate.
- Switch the mains fuse on.
- Run function test. Check and ensure the smooth running of the impeller. The air must be able to flow freely.