Mounting preparations Suitable mounting material is to be provided by the customer.Further informationRequirements in line with approvalPermitted installation positions:ER-APB: Preparations for installation with fire protection requirementsPreparations for wall, shaft or ceiling installation without fire protectionPreparations for the electrical connectionER-APB shut-off device, ER-AP shutter