ER-APB: Preparations for installation with fire protection requirements
Damage to unit, malfunctioning in the event of corrosion damage from mortar.
- Wrap ventilation ducts, connected to the unit, with a suitable adhesive tape to protect against corrosion inside the brickwork, e.g. using cold-shrink tape.