Safety instructions for the installation of the plastic shutter

It is essential to observe the permissible installation positions: Permitted installation positions:.

Damage to unit, malfunctioning in the event of corrosion damage from mortar.

  1. Wrap ventilation ducts, connected to the unit, with a suitable adhesive tape to protect against corrosion inside the brickwork, e.g. using cold-shrink tape.

Odours may escape from the ventilation channel.

If the installation position is wrong, the plastic shutter will not close leak-tight.

  1. Insert shutter at the top/to the right/to the left/to rear in the exhaust socket of the housing to fit the installation position. Ensure that the shutter closes entirely leak-tight.