Commissioning
- Switch on mains fuse and remove warning sign.
- Run function test. To do this, switch unit on and off, observe delay times (for control models Controls (circuit board types)).
- Check that the unit is running smoothly. It is also important that the air can flow unhindered.
- Switch off unit.
Operating the unit
Depending on model and connection variant, use switches provided by customer to switch the unit on and off. Barrier-free units do not need switches. Alternative connection options are described (Wiring diagrams).
- Standard, VZ and G model: The unit is switched on and off with switches that are to be provided by the customer.
- F model: Barrier-free. The unit switches on once the room lighting is activated. Can also be operated manually with optional switch.
- H model: Barrier-free, no switch needed. Can however also be operated manually with optional switch.