Important information about plastering
- Max. compensable plaster overshoot 7 mm.
- Installation at a depth of 50 to 100 mm can be compensated for with the ER-MR two-part wall frame.
- The gap remaining between the housing and shaft must be fully sealed with non-flammable materials that are resistant to deformation so that incorrect air is not drawn in.
Recommendation: Keep these installation and operating instructions until final installation in the housing.