Commissioning
- Check that connection data matches the technical data on the unit (rating plate).
- Ensure that the air can flow unhindered and that there are no foreign bodies in the air channel.
- Remove protection against switching back on and switch on mains fuse.
- Run function test. Ensure flow velocities < 1.5 m/s.