Checks before mounting

  1. Perform the following checks: D = detailed check, N = close inspection, S = visual inspection

Test schedule

D

N

S

I

Unit corresponds to EPL/zone requirements of the installation location.

II

Correct device group.

 

III

Correct temperature class for units.

 

IV

Degree of protection (IP degree) of units corresponds to level of protection / group / conductivity.

V

Unit power circuit name present and correct.

VI

Housing and connections satisfactory.

VII

Before installing, check that the motor bearing is working properly.