Commissioning

  1. Check that all screw connections are tight.
  2. Remove dirt from air channel.
  3. Remove protection against switching back on and switch on mains fuse.
  4. Run function test. Check direction of rotation and air flow direction and, if necessary, swap the cable connections over.
  5. Check/ensure smooth impeller running. Air must be able to flow freely.