Commissioning

  1. Check that all screw connections are tight.
  2. Ensure that the air can flow unhindered and that there are no foreign bodies in the air duct.
  3. Check that connection data matches the technical data on the fan (→ rating plate).
  4. Run function test. Check and ensure the direction of rotation/air flow direction and smooth running of the impeller.