Commissioning
- Check that all screw connections are tight.
- Ensure that the air can flow unhindered and that there are no foreign bodies in the air duct.
- Check that connection data matches the technical data on the fan (→ rating plate).
- Run function test. Check and ensure the direction of rotation/air flow direction and smooth running of the impeller.