Installing the MS 160

  1. Insert the MS 160 masonry block at the installation site in accordance with the local conditions (glue in place, pour concrete).

If installed incorrectly, condensation water may not drain off properly and cause damage to the building.

It is essential that the masonry block is installed exactly horizontally and in the correct installation position. Note labelling on top & inside. Check 1° gradient. Any condensation must be able to drip off to the outside. Observe the appropriate wall sleeve projection from the exterior wall for the respective external cover. For further information on wall sleeve installation → PP shell installation instructions, chapter Installation of wall sleeve, prescribed wall sleeve projection.