Installing PP 45 RS
- Insert the PP 45 RS at the installation site in accordance with the local conditions (glue in place, pour concrete).
If installed incorrectly, condensation water may not drain off properly and cause damage to the building.
PP 45 RS must be mounted exactly horizontally and in the correct installation position. Note labelling on top & inside. Check 1° gradient. Any condensation must be able to drip off to the outside. Observe the appropriate wall sleeve projection from the exterior wall for the respective external cover. For more information on wall sleeve installation → PP shell installation instructions.
- PP 45: Use the recess shown in the figure to feed the connection cable. This is positioned to match the line feedthrough of the PP 45.
- PPB-30: Feed the connection cable outside the masonry block.