External covers
PP 45 AE, PP 45 AW, PP 45 AS, PP 45 AK
- Once the external plastering is complete, remove the plaster protective cover.
- Take off the front cover of external cover’s housing.
- Align housing horizontally and centred with wall sleeve, mark 4 fixing holes, position dowels and screw down housing to exterior wall with 4 screws.
- Seal bottom third of spaces between wall sleeve and housing with permanently elastic and weatherproof sealant e.g. sealing strip (silicone).
- Press front cover onto housing so it engages all the way round. Additionally secure stainless steel front cover with two stainless steel screws.
- Seal front cover to exterior wall with permanently elastic and weatherproof sealant (arrows S2). Suitable sealing material is to be supplied by the customer.