Commissioning ventilation system
- Ensure that all ventilation units, room air controls and system components are correctly connected in accordance with the wiring diagram in the appendix.
- Remove warning sign. Switch the mains fuses on. The ventilation units start up in ventilation level 2 and heat recovery operating mode.
- Call up service mode or commissioning software and undertake the parameter settings.
- Finish by performing a function test:
• Test operation and operating modes.
• Test ventilation levels and off-function.
• Test the EnOcean functions for the radio-controlled units.
• Test LEDs on the room air controls or the radio ventilation units → Operating instructions.