Commissioning ventilation system

  1. Ensure that all ventilation units, room air controls and system components are correctly connected in accordance with the wiring diagram in the appendix.
  2. Remove warning sign. Switch the mains fuses on. The ventilation units start up in ventilation level 2 and heat recovery operating mode.
  3. Call up service mode or commissioning software and undertake the parameter settings.
  4. Finish by performing a function test:
    • Test operation and operating modes.
    • Test ventilation levels and off-function.
    • Test the EnOcean functions for the radio-controlled units.
    • Test LEDs on the room air controls or the radio ventilation units → Operating instructions.