Positioning of wall sleeve
NOTICE
Installation position, interior wall: Once the plaster has been applied or wallpaper put up etc., the wall sleeve must end flush with the interior wall.
Installation position, exterior wall: Wall sleeve must protrude beyond the exterior plaster after this plaster has been applied. Observe the following wall sleeve projections towards the exterior wall! The projection is needed as a drip edge within the external cover.
Required wall sleeve projection for PP 45 RHK, PP 45 RHL, PP 45 RS and MS 160 with | wall thickness W |
PP 45 AK PP 45 AE PP 45 AW PP 45 AS | W + 10...15 mm |
PP 45 AKR PP 45 AKB | W + 0...4 mm |
PP 45 LE | W + 20...25 mm |
PPB 30 AK PPB 30 AE PPB 30 AW PPB 30 AS | W + 5...10 mm |
PPB 30 ARE PPB 30 ARW | W + depth of the PPB 30 AE / PPB 30 AW + 5...10 mm |