Installation of external covers PP 45 AK / PP 45 AE / PP 45 AW / PP 45 AS
(once exterior wall is fully plastered)
Drilling distances of external covers PP 45 AE / PP 45 AW / PP 45 AS (stainless steel/white/black)
Drilling distances for external cover PP 45 AK (plastic)
Exercise caution when handling housing parts with sharp edges, e.g. stainless steel external covers
Wear protective gloves.
- Once the external plastering is complete, remove the plaster protective cover.
F | Front cover |
G | Housing |
- Take off the front cover of external cover’s housing.
- Align housing horizontally and centred with wall sleeve, mark 4 fixing holes, position dowels and screw down housing to exterior wall with 4 screws. Suitable mounting material is to be provided by the customer.
G | Housing |
S1 | Sealing strip (silicone) |
- Seal bottom third of spaces between wall sleeve and housing with permanently elastic and weatherproof sealant e.g. sealing strip (silicone).
- Press front cover onto housing so it engages all the way round. Place external cover (stainless steel/white/black) on the housing and tighten the pre-assembled screws.
- Seal front cover to exterior wall with permanently elastic and weatherproof sealant (arrows S2). Suitable sealing material is to be supplied by the customer.