Installation of external covers PP 45 AK / PP 45 AE / PP 45 AW / PP 45 AS

(once exterior wall is fully plastered)

Drilling distances of external covers PP 45 AE / PP 45 AW / PP 45 AS (stainless steel/white/black)

Drilling distances for external cover PP 45 AK (plastic)

Exercise caution when handling housing parts with sharp edges, e.g. stainless steel external covers

Wear protective gloves.

  1. Once the external plastering is complete, remove the plaster protective cover.

F

Front cover

G

Housing

  1. Take off the front cover of external cover’s housing.
  2. Align housing horizontally and centred with wall sleeve, mark 4 fixing holes, position dowels and screw down housing to exterior wall with 4 screws. Suitable mounting material is to be provided by the customer.

G

Housing

S1

Sealing strip (silicone)

  1. Seal bottom third of spaces between wall sleeve and housing with permanently elastic and weatherproof sealant e.g. sealing strip (silicone).
  2. Press front cover onto housing so it engages all the way round. Place external cover (stainless steel/white/black) on the housing and tighten the pre-assembled screws.
  3. Seal front cover to exterior wall with permanently elastic and weatherproof sealant (arrows S2). Suitable sealing material is to be supplied by the customer.