Unit structure and positioning
1 | Wall sleeve |
2 | Slide-in module |
3 | Fluid separator, outside |
4 | Centring ring |
5 | Extension duct: Standard 200 mm, with optional PPB 30 VS extension kit, 500 mm |
6 | Centring ring, in scope of supply of PPB 30 VS extension kit Centring ring, in scope of supply of PPB 30 VS extension kit |
7 | Sealing strip for external cover |