Notes before initial commissioning
The RLT unit is supplied ready for connection and programmed with basic parameters and is immediately ready for operation after connecting the enclosed control panel.
First connect the unit electrically.
For units with a water supplementary heat register [WH], the flow and return connections to the heating system must be connected on site.
When the unit is connected electrically, on the air side, on the water side and with the condensate drain, it is commissioned for the first time.
The unit must not be used during construction work (extreme soiling) and for dehumidifying new buildings (condensation!)!