Connecting the sound-insulation distributor
The SDV/KSDV sound-insulation distributor can be connected to the DN 125 connections.
With the ventilation unit prepared as before, proceed as follows:
- Ensure a level surface at the installation site.
Risk of injury from falling unit if inadequately secured
- Suitable mounting material is to be provided by the customer.
- Connect the sound-insulation distributor to the ventilation unit.
- Screw the sound-insulation distributor to the wall, ceiling or directly to a bracket using suitable fastening material.
Leakage from distorted ventilation ducts.
- Ensure assembly without distortion.
- Push the ventilation ducts on vertically, as far as they will go, and seal them (Sealing ring MF-FDR75 (0175.0262) or MA-D75 (0175.0334)).
1
MF-F75 / MA-FR75 flexible duct
2
Sealing ring MF-FDR75 / MA-D75
- Connect to supply air/exhaust air side with Maico MF-F75 or MA-FR75 flexible duct.