Ventilation for humidity protection
Interval operation alternating between 13 minutes on with ventilation level I and 17 minutes off.
Ventilation to ensure preservation of building (humidity) under usual usage conditions and with humidity loads reduced at times. Output of approx. 43% of reduced ventilation (according to DIN 1946-6).