Powerbox WS 75 final installation instructions

 

 

Final installation units

These final installation instructions contain important information on final installation of the Powerbox H with APA/UPA/UPGA front cover, installation of the Powerbox S and commissioning of the ventilation unit. Spare parts and accessories are also listed.

Additional instructions and videos

Video – Installation of WS 75 Powerbox S

 

 

Video – Electrical connection of WS 75

 

 

Video – WS 75 Installation and function of the RLS G1 WS operating unit

 

 

Video – WS 75 Tutorial on commissioning and basic settings

Video – WS 75 Air filter change