External placement on flush-mounted electrical box

Lay the control cable during the shell construction phase.

  1. Guide control cable into electronics compartment of the Powerbox and connect to RS 485 bus, as shown in wiring diagram.
  2. Insert optional RLS G1 V sealing kit into design/glass cover. Do not operate without sealing kit.
  3. Guide control cable into flush-mounted electrical box.
  4. Remove the socket of the enclosed connection cable, fitted in the factory, and fit on the control cable → Observe wiring diagram.
  5. Connect operating unit’s plug with socket.
  6. Fit operating unit on flush-mounted electrical box.