External placement on flush-mounted electrical box
Lay the control cable during the shell construction phase.
- Guide control cable into electronics compartment of the Powerbox and connect to RS 485 bus, as shown in wiring diagram.
- Insert optional RLS G1 V sealing kit into design/glass cover. Do not operate without sealing kit.
- Guide control cable into flush-mounted electrical box.
- Remove the socket of the enclosed connection cable, fitted in the factory, and fit on the control cable → Observe wiring diagram.
- Connect operating unit’s plug with socket.
- Fit operating unit on flush-mounted electrical box.