Commissioning pre-requirements
Commissioning is only permitted if:
- the building is ready for occupancy.
- all connection cables are correctly fitted and secure.
- all supply air and exhaust air valves are mounted and open.
- the ventilation ducts are insulated.
- all outgoing air and outside air covers are mounted.
- all protective materials (e.g. filters provided by customer) are removed.
- the ventilation unit is correctly connected to the power supply and the cable lead-throughs are sealed.
- the DIP switches of installed, optional additional circuit boards are set to suit the application → accessories instructions.