Preparation for ceiling installation (with fire protection)
(Connection outside of the shaft)
11 | Dowel for drill holes | 12 | Main duct (steel folded spiral-seams duct) |
13 | Connection duct: steel folded spiral-seams duct. | 14 | Power cable |
Preparing the shaft
- Produce opening in shaft or alternatively produce a wall facing. Ensure a suitable, flat surface for the housing so that the fan insert can be safely inserted in the housing later on.
- Correctly attach main duct inside the shaft.
- For fire protection systems, use ceiling compound. To do this, encase the ceiling and pour in the material from above.
- Connect connection duct, suitable for the housing, to the main duct and seal for ventilation.
- Cut connection duct to length, note a maximum duct length of 2 m.
- Lay suction duct and seal gap remaining correctly as described in previous mounting instructions.
- Lay power cable in shaft and allow to protrude by around 30 cm above the shaft opening.
- Lay power cable: Electrically connecting the unit.