Installing terminal box (optional)
The box is delivered on a pallet.
Scope of delivery:
1 x terminal box |
2 x insulation |
4 x cover panel |
2 x aluminium profile |
8 x corner connector |
43 x drilling screw 3.5 x 13 |
4 x M8 threaded screw |
4 x shim |
4 x sealing strip 10 x 10 mm |
1 x roll of sealing strip 10 x 4 mm |
- Produce cut-out in wall / window. Note minimum cross-section area per cut-out (900 H = 0.078 m², 600 H = 0.05 m²)
- Use the aluminium profile included in the scope of delivery and the eight insert brackets, to create two frames to match the window cut-outs.
- Affix the sealing strip (10 x 4 mm) to the wide side of the frames.
- Affix the 10 x 10 mm sealing strip on the narrow side of the frames.
- Draw the planned passage cross-section on the rear panel (supplied loose) of the terminal box.
Note minimum cross-section area per cut-out: geniovent.x 900 H = 0.078 m², geniovent.x 600 H = 0.05 m².
To transfer the cut-outs onto the rear panel of the terminal box, you can use the connection frame as a template.
- Cut out sheet metal.
- Once the two cut-outs are completed, adjust the two pieces of thermal insulation (supplied loose) to match the cross-section cut-out and glue them to the inside of the loose rear panel.
- Screw rear panel, including insulation, to terminal box (27 x drilling screws, 3.5 x 13mm).
- Screw the two connection frames to the terminal box (16 x drilling screws 3.5 x 13 mm).
- Use the four M8 x 25 mm screws supplied to permanently screw down the terminal box to the unit.
- Fit the unit (including the mounted terminal box) onto the two designated cut-outs on the façade and screw the façade element to the frame. The sealing strip used provides a sealed connection between the façade element and frame.