ER-UPB/R, ER-UPB/L and ER-UPB/U installation (second room)
5.1 | Steel connection socket DN 75/80 for second room extraction on ER-UPB |
6 | Protective grille |
7 | Filter mat filter class G2 |
8 | Adapter |
9 | 9 Suction duct, second room connection: Steel folded spiral-seams duct DN 75/80 |
- Install housing as described in these instructions.
- Secure suction duct and steel socket with 3 steel blind rivets or steel screws and connect sealed for ventilation.
- Produce fixing holes for adapter and insert dowels.
- Connect adapter fully sealed to suction duct, e.g. with cold-shrink tape.
- Secure adapter to the wall with screws.
- Insert filter mat and fit protective grille in the correct position.