Approval provisions

Approval provision

ER-UP/G + ER 60/100/second room

ER-UPD + ER 60/100/second room

ER-UPB + ER 60/100/

ER-UPB + ER second room

Number of units per floor, residential unit or fire zone

Max. 3 fans or 3 connections

Max. 3 fans or 3 connections

Max. 3 fans or 3 connections

Max. 3 fans or 3 connections

Shaft wall

any board material

Min. 35 mm, any board material

Min. 35 mm, any board material

Min. 35 mm, any board material

Connection diameter

DN 75 or DN 80 mm

Connection ducts inside the shaft

E.g. AFR 80 flexible aluminium duct between main duct in shaft and ER unit, max. 2 m long (→ approval).

Steel folded spiral-seams duct between main duct in shaft and ER unit, max. 2 m long (→ approval)

Flexible aluminium duct AFR 80 or steel folded spiral-seams duct between main duct in shaft and ER unit, max. 2 m long (→ approval).

Flexible aluminium duct AFR 80 or steel folded spiral-seams duct between main duct in shaft and ER unit, max. 2 m long (→ approval). Steel folded spiral-seams duct between ER unit and second room connection.

Connection ducts outside the shaft

E.g. AFR 80 flexible aluminium duct between main duct in shaft and ER unit, max. 2 m long (→ approval).

Steel folded spiral-seams duct DN 75 or DN 80 between main duct in shaft and ER unit, max. 2 m long (→ approval).

Duct elbows in the unit connection duct

Max. 90° bend,
ascending

 

 

Number of duct elbows permitted for wall installation

Max. 2 x 90°

Number of duct elbows permitted for ceiling installation

Max. 2 x 90°

Regulating equipment in the exhaust air duct

Not permitted

 

 

Wall/ceiling opening for DN 80 unit connection duct

Brickwork or concrete: 130 mm.

Board materials (F90): Outer Ø of pipe