Language
Deutsch
English
Français
Polski
Home
Preface
Overview of ER AP/APB system
Scope of delivery
Additional information
Specialist installer qualifications
Intended use
Safety instructions and warnings
General safety instructions
Safety instructions regarding installation, operation, cleaning and maintenance
Safety instructions
General safety instructions
Safety instructions regarding installation, operation, cleaning and maintenance
ER-APB: Safety instructions for installation of the fire protection shut-off device
Safety instructions for the installation of the plastic shutter
System and product information
Certificates of approval
Installation conditions
Permitted exhaust air systems
Unit versions
Product features
Controls (circuit board types)
Technical data
Environmental conditions and operating limits
Regulations for operation with fireplaces
Technical data table
Storage
Mounting preparations
Requirements in line with approval
Approval provisions
Permitted installation positions:
ER-APB: Preparations for installation with fire protection requirements
Preparations for ER-APB wall installation (with fire protection)
Preparations for the ER-APB ceiling installation (with fire protection)
Preparations for wall, shaft or ceiling installation without fire protection
Preparations for the electrical connection
ER-APB shut-off device, ER-AP shutter
Housing installation
Wall installation, lower part of housing
Ceiling installation, lower part of housing
Electrical connection
Installation of fan insert and upper part of housing
Commissioning
Cleaning, maintenance
Cleaning the backflow preventer/shut-off device
Fault rectification
Spare parts
System and accessory components
Accessories
Removing the housing
Environmentally responsible disposal
Wiring diagrams
Wiring diagrams ER AP/APB